fbpx

Agreement between Owner and Contractor for Construction Philippines

9. That the retention guarantee be released no later than two (2) weeks after the acceptance by the owner of the renovation carried out. 5. Construction will begin on January 1, 20__. 2. In order for the CONTRACTOR to obtain the necessary permits for construction, he is responsible for the purchase of materials, the recruitment of staff, coordination with the architect and the owner regarding the design details and the approval of materials. Shelves, cabinet doors, laminates and other details on surfaces: according to specification 8. That 10% of the payments to the CONTRACTOR will be kept by the OWNER as a guarantee for the completion of the work. Use plasterboard as a ceiling with a sealing layer and followed by two semi-glossy enamels with dotted finish Install a system of suspended ceiling beams as shown on the reflected ceiling plan Install 12 x 12 Mariwasa ceramic floor tiles (Montalban Beige & Red). Install 12 mm thick clear tempered glass panes (exterior walls) with floor frames according to the working drawings on the layout signage plans of elevations 1, 2 and 3) and install electrical wiring, wiring, boxes, circuit breakers, comfort sockets and power supply for appliances, signage and telephone lines 4. That the ENTREPRENEUR pays a contractual penalty of 1% of the contract price for each day of delay in sales. Install a polyvinyl (PVC) pipe for sewer and sewer pipe with solvent cement fitting (ASTM D2564). Make all wetlands waterproof with Hygard, Thoroseal or the approved equivalent 1.

That the CONTRACTOR undertakes to complete / renovate ABC COFFEE SHOP in (address) at the contractual price of Pesos: 000,000.00 (amount in words). Submit a plan as constructed duly signed by a licensed plumbing engineer that WE, (name of contractor), legal age, single/married, resident (address), hereinafter referred to as contractor and (name of owner), adult, single/married, resident (address) and hereinafter known as OWNER, hereby accept and declare: 3. That the contractor shall operate said café said contract price and in accordance with the plans and specifications painting, tiling and finishing of the interior walls as indicated in the surface calendar 7. That the OWNER undertakes to pay 30% of the contract price at least 5 working days before the scheduled start date as a deposit and the balance of 70% in weekly equal payments based on the date of signature until the expected completion of the project. Additional fees, if any, will be paid as required. Install high-density polypropylene (PP-R) piping for the water pipe Install pin lamps, special drop lamps, recessed lights, halogen directional lamps and other electrical requirements specified in the plans. Install the automatic voltage regulator for the Water Treatment System Manufacturing and install plywood meters with a solid surface material of 12 mm. Production of decorative frieze in metal of 3mm in antique finish .. .